Mr Steven came across PPHS after seeing us completing a lot of work on other homes on the site. Originally, he wanted his chassis refurbished, and new Underfloor Insulation installed. As luck would have it, we were actually able to find funding for Mr Steven to have his insulation installed, which he was thrilled about! This saving allowed him to explore further upgrades on his home. As a result of successful completion of the underfloor work, Mr Steven commissioned us to completed work on his bathroom
The previous occupants had installed a poorly fitted wetroom, and this did not meet the requirements of Mr Steven. Therefore he asked us to supply and quotation for a new bathroom.
After consideration of our quotation, Mr Steven decided to accept it, and with delight we began the process of installing his bathroom.
Head of Kitchen and Bathroom installation; Anthony Nally visited Mr Steven and spent time working through his requirements, after all information was gathered he went away and produced a design that he was extremely happy with.
The design was focused on future proofing the bathroom and giving him the contemporary look he was after. Future Proofing rooms are extremely important to our customers, and even small details like installing a walk in shower meant that in the future when bending down or stepping into a bath may become an issue, customers can still use their showers as they are floor level, as opposed to bath tubs.